Project NumberProject FocusBuilding
BSU-01Fluid Cooler024 Math Geo
BSU-02Central Heat Plant006 Heat Plant
BSU-03Utility TunnelsCampus Wide
BSU-4.01Fire Alarms030 Liberal Arts
BSU-4.02Fire Alarms024 Math Geo
BSU-5.01Generator015 Extra Mile Arena
BSU-5.02Generator034 RiverFront Hall
BSU-5.03Generator289 Yankee
BSU-5.04Generator029 Ruch Engineering
BSU-6.01Switchgear030 Liberal Arts
BSU-6.02Switchgear027 Library
BSU-6.03Switchgear016 SMASH
BSU-6.04Switchgear024 Math Geo
BSU-7Chiller015 Extra Mile Arena
BSU-8HVAC289 Yankee
BSU-9.01HVAC030 Liberal Arts
BSU-10.01HVAC100 High Bay HML
BSU-11.01HVAC029 Ruch Engineering
BSU-12HVAC034 RiverFront Hall
BSU-15Roof015 Extra Mile Arena
BSU-16Roof030 Liberal Arts
BSU-17Roof034 RiverFront Hall
BSU-23.01Storefront028 Boulder Hall
BSU-23.02Storefront267 Environmental Research Building
BSU-25Concrete Ramp027 Library
BSU-27Galvanized Pipe013/014 Morrison Center
BSU-28Galvanized Pipe031 Chaffee
BSU-33Asphalt035 Stadium West lot
BSU-43Renovation007 Campus School