Current Project Advertisements

For additional information on projects managed by the State of Idaho Division of Public Works, follow the links below:

Advertisement for Bid

Bid AdvertiserProject NumberProject TitleBid DateLink to Bid Information
DPWDPW26-191S. Campus Power Loop Connection07/24/26Visit the DPW Construction Projects page for more information.
DPWDPW26-195Yanke Irrigation System06/30/26Visit the DPW Construction Projects page for more information.

Request for Qualification (RFQ)

RFQ AdvertiserRFQ TypeProject NumberProject TitleSubmission DeadlineLink to RFQ Information
Division of Public Works (DPW)Design-BuildDPW26-193Multi Bldg. Fire Alarm System Replacement06-18-26View the DPW professional services web page for more information.

Recent Bid & RFQ Results

Project Bid Results

Project Number DPW25-214D

  • Bid Advertiser: Boise State University
  • Bid Date: 06/23/26
  • Project Name: Communication Building Miscellaneous Repairs: Exterior Walls

Contractor Total Bid Amount
Bobo Construction Base Bid: $298,000
Alternate 1: $20,000
Alternate 2: $15,000
Alternate 3: $25,000
Alternate 4: $8,500
Pioneer Waterproofing Base Bid: $165,000
Alternate 1: $7,200
Alternate 2: $11,500
Alternate 3: $5,300
Alternate 4: $7,800
Hydro-Tech Inc. Base Bid: $157,000
Alternate 1: $17,000
Alternate 2: $25,000
Alternate 3: $69,500
Alternate 4: $42,000

Project Number BSU24-022

  • Bid Advertiser: Boise State University
  • Bid Date: 05/13/25
  • Project Name: Greenbelt Completion

Contractor Total Bid Amount
Bobo Construction $856,991.04
Stroth General $928,313.48
Paul Construction $934,645.10
Knife River $977,855.00
Quality Contractors $1,083,748.00
Alpine $1,156,483.00

Project Number DPW26-197

  • Bid Advertiser: DPW
  • Bid Date: 05-07-26
  • Project Name: Multi Bldg Roof Replacements

Request for Qualification (RFQ)

RFQ AdvertiserRFQ TypeProject NumberProject TitleSubmission DeadlineLink to RFQ Information
Division of Public Works (DPW)Design-BuildDPW26-193Multi Bldg. Fire Alarm System Replacement06-18-26View the DPW professional services web page for more information.

Project Number DPW26-205D

  • Bid Advertiser: Boise State University
  • Bid Date: 04-29-26
  • Project Name: ERB Lab 5108 Repairs

Contractor Total Bid Amount
Leverage General Base Bid: $99,491
Alternate 1: $8,400
Andersen Construction Base Bid: $204,420
Alternate 1: $15,000
Petra General Contracting Base Bid: $182,403
Alternate 1: $3,913
Alpine Construction Management Base Bid: $184,521
Alternate 1: $18,065

Project Number DPW26-199D

  • Bid Advertiser: Boise State University
  • Bid Date: 04-28-26
  • Project Name: Student Union Food Court Remodel

Contractor Total Bid Amount
Leverage General Base Bid: $519,500
Andersen Construction Base Bid: $448,420
Alpine Construction Base Bid: $440,000
Optimum Build Group Base Bid: $539,341

Project Number DPW25-191

  • Bid Advertiser: DPW
  • Bid Date: 03-13-2026
  • Project Name: MPCB Generator Backup Power

Contractor Total Bid Amount
Twin City Electricians $352,325
Pacific Source Electric $332,000
Quality Electric NON-RESPONSIVE
Power Plus $303,851

Project Number DPW26-207D

  • Bid Advertiser: Boise State University
  • Bid Date: 03-03-26
  • Project Name: Center for Teaching and Learning Reno Ph 2

Contractor Total Bid Amount
Hall & Hill Construction Base Bid: $218,813
Alternate 1: $-6,975
Beal Corp Base Bid: $227,000
Alternate 1: $-10,000
JP2 Construction Base Bid: $239,000
Alternate 1: $-9,000
Optimum Build Group Base Bid: $257,086
Alternate 1: $-12,160
Alpine Construction Management Base Bid: $235,606
Alternate 1: $-10,418.35
Andersen Construction Base Bid: $199,420
Alternate 1: $-6,720

Project Number DPW24-199

  • Bid Advertiser: DPW
  • Bid Date: 02-04-26
  • Project Name: Emergency Operations Center (EOC) Remodel

Contractor Total Bid Amount
BPR Companies NON-RESPONSIVE
Prusik Construction Base Bid: $824,500
Alternate 1: $9,399
Alternate 2: $4,299
Alternate 3: $2,500
Verticon Corp. Base Bid: $759,096
Alternate 1: $9,259
Alternate 2: $8,087
Alternate 3: $1,481
Wright Brothers Base Bid: $887,155
Alternate 1: $5,635
Alternate 2: $6,825
Alternate 3: $450
Pentex Builders BID-RELIEF GRANTED
Barrier Building Base Bid: $736,000
Alternate 1: $6,220
Alternate 2: $7,531
Alternate 3: $0
Triple G Base Bid: $767,100
Alternate 1: $2,252
Alternate 2: $8,002
Alternate 3: $1,481
Optimum Build Group NON-RESPONSIVE
Alpine Construction Base Bid: $764,757
Alternate 1: $2,475
Alternate 2: $7,555
Alternate 3: $4,543
JP2 Construction Base Bid: $788,000
Alternate 1: $2,839
Alternate 2: $6,781
Alternate 3: $0
BOBO Construction NON-RESPONSIVE

Project Number DPW25-211

  • Bid Advertiser: DPW
  • Bid Date: 01-31-26
  • Project Name: EMA Surveillance System

Contractor Total Bid Amount
Quality Electric Base Bid: $419,549
Alternate 1: $29,541
Alternate 2: $31,031
Alternate 3: $32,488
Alternate 4: $24,055
Alternate 5: $25,685
Convergint Technologies NON-RESPONSIVE
Long Building Tech Base Bid: $481,117
Alternate 1: $47,653
Alternate 2: $15,289
Alternate 3: $18,792
Alternate 4: $12,017
Alternate 5: $16,817

RFQ Submission Results

Project Number DPW26-208

  • RFQ Advertiser: DPW
  • RFQ Type: Design Build Services
  • RFQ Date: 04-23-26
  • Project Name: Kinesiology Annex Remodel-LIMBR Center

Consultant Points
Okland Construction + Hummel 91.47
Andersen Construction + Cushing Terrell 84.94
Core Construction + LCA 84.73
McAlvain Construction + CSHQA 81.79

Project Number DPW24-190

  • RFQ Advertiser: DPW
  • RFQ Type: CM/GC Services
  • RFQ Date: 12-29-25
  • Project Name: Science Research Building

Consultant Points
Andersen Construction 85.4
CORE Construction 82.2
Hensel Phelps 78.8
Layton Construction 77.4
ESI Construction 71.4

Project Number DPW26-194

  • RFQ Advertiser: DPW
  • RFQ Type: Architect/Engineer Services
  • RFQ Date: 11-18-25
  • Project Name: Multi Building Switchgear Replacements

Consultant Points
WSP USA Buildings 84.8
Cator Ruma 80.7
Musgrove Architects 79

Project Number DPW26-196

  • RFQ Advertiser: DPW
  • RFQ Type: Architect/Engineer Services
  • RFQ Date: 10-29-25
  • Project Name: Multi Bldg. HVAC R-22 Replacements

Consultant Points
Cushing Terrell 87.10
CSHQA 80.70

Project Number DPW25-195

  • RFQ Advertiser: DPW
  • RFQ Type: Architect/Engineer Services
  • RFQ Date: 9-25-25
  • Project Name: Albertsons Library Renovations

<!– wp:acf/faqs {“name”:”acf/faqs”,”data”:{“field_0885125a”:”Recent Bid \u0026amp; RFQ Results”,”field_583a86f2″:”Search Project Numbers”,”field_1c6039f8″:{“row-0”:{“field_4d61ccc5″:”Project Bid Results”,”field_94414ea2″:{“row-0”:{“field_900c95cf”:”Project Number DPW25-214D”,”field_7d64e781″:”\u003cul\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eBid Advertiser: Boise State University\u003c/strong\u003e\u003c/li\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eBid Date: \u003c/strong\u003e06/23/26\u003c/li\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eProject Name:\u003c/strong\u003e Communication Building Miscellaneous Repairs: Exterior Walls\u003c/li\u003e\r\n\u003c/ul\u003e\r\n

Contractor Total Bid Amount
Bobo Construction Base Bid: $298,000
Alternate 1: $20,000
Alternate 2: $15,000
Alternate 3: $25,000
Alternate 4: $8,500
Pioneer Waterproofing Base Bid: $165,000
Alternate 1: $7,200
Alternate 2: $11,500
Alternate 3: $5,300
Alternate 4: $7,800
Hydro-Tech Inc. Base Bid: $157,000
Alternate 1: $17,000
Alternate 2: $25,000
Alternate 3: $69,500
Alternate 4: $42,000

“},”row-1”:{“field_900c95cf”:”Project Number BSU24-022″,”field_7d64e781″:”\u003cul\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eBid Advertiser: Boise State University\u003c/strong\u003e\u003c/li\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eBid Date: \u003c/strong\u003e05/13/25\u003c/li\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eProject Name:\u003c/strong\u003e Greenbelt Completion\u003c/li\u003e\r\n\u003c/ul\u003e\r\n

Contractor Total Bid Amount
Bobo Construction $856,991.04
Stroth General $928,313.48
Paul Construction $934,645.10
Knife River $977,855.00
Quality Contractors $1,083,748.00
Alpine $1,156,483.00

“},”row-2”:{“field_900c95cf”:”Project Number DPW26-197″,”field_7d64e781″:”\u003cul\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eBid Advertiser: DPW\u003c/strong\u003e\u003c/li\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eBid Date: 05-07-26\u003c/strong\u003e\u003c/li\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eProject Name:\u003c/strong\u003e Multi Bldg Roof Replacements\u003c/li\u003e\r\n\u003c/ul\u003e\r\n\u003c!\u002d\u002d wp:heading {\u0022anchor\u0022:\u0022h-request-for-qualification-rfq\u0022} \u002d\u002d\u003e\r\n\u003ch2 id=\u0022h-request-for-qualification-rfq\u0022 class=\u0022wp-block-heading\u0022\u003eRequest for Qualification (RFQ)\u003c/h2\u003e\r\n\u003c!\u002d\u002d /wp:heading \u002d\u002d\u003e \u003c!\u002d\u002d wp:tablepress/table {\u0022id\u0022:\u002238\u0022} \u002d\u002d\u003e

RFQ Advertiser RFQ Type Project Number Project Title Submission Deadline Link to RFQ Information
Division of Public Works (DPW) Design-Build DPW26-193 Multi Bldg. Fire Alarm System Replacement 06-18-26 View the DPW professional services web page for more information.

\u003c!\u002d\u002d /wp:tablepress/table \u002d\u002d\u003e”},”row-3″:{“field_900c95cf”:”Project Number DPW26-205D”,”field_7d64e781″:”\u003cul\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eBid Advertiser: Boise State University\u003c/strong\u003e\u003c/li\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eBid Date: 04-29-26\u003c/strong\u003e\u003c/li\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eProject Name:\u003c/strong\u003e ERB Lab 5108 Repairs\u003c/li\u003e\r\n\u003c/ul\u003e\r\n

Contractor Total Bid Amount
Leverage General Base Bid: $99,491
Alternate 1: $8,400
Andersen Construction Base Bid: $204,420
Alternate 1: $15,000
Petra General Contracting Base Bid: $182,403
Alternate 1: $3,913
Alpine Construction Management Base Bid: $184,521
Alternate 1: $18,065

“},”row-4”:{“field_900c95cf”:”Project Number DPW26-199D”,”field_7d64e781″:”\u003cul\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eBid Advertiser: Boise State University\u003c/strong\u003e\u003c/li\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eBid Date: 04-28-26\u003c/strong\u003e\u003c/li\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eProject Name:\u003c/strong\u003e Student Union Food Court Remodel\u003c/li\u003e\r\n\u003c/ul\u003e\r\n

Contractor Total Bid Amount
Leverage General Base Bid: $519,500
Andersen Construction Base Bid: $448,420
Alpine Construction Base Bid: $440,000
Optimum Build Group Base Bid: $539,341

“},”row-5”:{“field_900c95cf”:”Project Number DPW25-191″,”field_7d64e781″:”\u003cul\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eBid Advertiser: \u003ca href=\u0022https://dpw.idaho.gov/construction/\u0022\u003eDPW\u003c/a\u003e\u003c/strong\u003e\u003c/li\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eBid Date: 03-13-2026\u003c/strong\u003e\u003c/li\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eProject Name:\u003c/strong\u003e MPCB Generator Backup Power\u003c/li\u003e\r\n\u003c/ul\u003e\r\n

Contractor Total Bid Amount
Twin City Electricians $352,325
Pacific Source Electric $332,000
Quality Electric NON-RESPONSIVE
Power Plus $303,851

“},”row-6”:{“field_900c95cf”:”Project Number DPW26-207D”,”field_7d64e781″:”\u003cul\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eBid Advertiser: Boise State University\u003c/strong\u003e\u003c/li\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eBid Date: 03-03-26\u003c/strong\u003e\u003c/li\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eProject Name:\u003c/strong\u003e Center for Teaching and Learning Reno Ph 2\u003c/li\u003e\r\n\u003c/ul\u003e\r\n

Contractor Total Bid Amount
Hall & Hill Construction Base Bid: $218,813
Alternate 1: $-6,975
Beal Corp Base Bid: $227,000
Alternate 1: $-10,000
JP2 Construction Base Bid: $239,000
Alternate 1: $-9,000
Optimum Build Group Base Bid: $257,086
Alternate 1: $-12,160
Alpine Construction Management Base Bid: $235,606
Alternate 1: $-10,418.35
Andersen Construction Base Bid: $199,420
Alternate 1: $-6,720

“},”row-7”:{“field_900c95cf”:”Project Number DPW24-199″,”field_7d64e781″:”\u003cul\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eBid Advertiser: \u003ca href=\u0022https://dpw.idaho.gov/construction/\u0022\u003eDPW\u003c/a\u003e\u003c/strong\u003e\u003c/li\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eBid Date: 02-04-26\u003c/strong\u003e\u003c/li\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eProject Name:\u003c/strong\u003e Emergency Operations Center (EOC) Remodel\u003c/li\u003e\r\n\u003c/ul\u003e\r\n

Contractor Total Bid Amount
BPR Companies NON-RESPONSIVE
Prusik Construction Base Bid: $824,500
Alternate 1: $9,399
Alternate 2: $4,299
Alternate 3: $2,500
Verticon Corp. Base Bid: $759,096
Alternate 1: $9,259
Alternate 2: $8,087
Alternate 3: $1,481
Wright Brothers Base Bid: $887,155
Alternate 1: $5,635
Alternate 2: $6,825
Alternate 3: $450
Pentex Builders BID-RELIEF GRANTED
Barrier Building Base Bid: $736,000
Alternate 1: $6,220
Alternate 2: $7,531
Alternate 3: $0
Triple G Base Bid: $767,100
Alternate 1: $2,252
Alternate 2: $8,002
Alternate 3: $1,481
Optimum Build Group NON-RESPONSIVE
Alpine Construction Base Bid: $764,757
Alternate 1: $2,475
Alternate 2: $7,555
Alternate 3: $4,543
JP2 Construction Base Bid: $788,000
Alternate 1: $2,839
Alternate 2: $6,781
Alternate 3: $0
BOBO Construction NON-RESPONSIVE

“},”row-8”:{“field_900c95cf”:”Project Number DPW25-211″,”field_7d64e781″:”\u003cul\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eBid Advertiser: \u003ca href=\u0022https://dpw.idaho.gov/construction/\u0022\u003eDPW\u003c/a\u003e\u003c/strong\u003e\u003c/li\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eBid Date: 01-31-26\u003c/strong\u003e\u003c/li\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eProject Name:\u003c/strong\u003e EMA Surveillance System\u003c/li\u003e\r\n\u003c/ul\u003e\r\n

Contractor Total Bid Amount
Quality Electric Base Bid: $419,549
Alternate 1: $29,541
Alternate 2: $31,031
Alternate 3: $32,488
Alternate 4: $24,055
Alternate 5: $25,685
Convergint Technologies NON-RESPONSIVE
Long Building Tech Base Bid: $481,117
Alternate 1: $47,653
Alternate 2: $15,289
Alternate 3: $18,792
Alternate 4: $12,017
Alternate 5: $16,817

“}}},”row-1”:{“field_4d61ccc5″:”RFQ Submission Results”,”field_94414ea2″:{“row-0”:{“field_900c95cf”:”Project Number DPW26-208″,”field_7d64e781″:”\u003cul\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eRFQ Advertiser: DPW\u003c/strong\u003e\u003c/li\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eRFQ Type:\u003c/strong\u003e Design Build Services\u003c/li\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eRFQ Date: 04-23-26\u003c/strong\u003e\u003c/li\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eProject Name:\u003c/strong\u003e Kinesiology Annex Remodel-LIMBR Center\u003c/li\u003e\r\n\u003c/ul\u003e\r\n

Consultant Points
Okland Construction + Hummel 91.47
Andersen Construction + Cushing Terrell 84.94
Core Construction + LCA 84.73
McAlvain Construction + CSHQA 81.79

“},”row-1”:{“field_900c95cf”:”Project Number DPW24-190″,”field_7d64e781″:”\u003cul\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eRFQ Advertiser: DPW\u003c/strong\u003e\u003c/li\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eRFQ Type:\u003c/strong\u003e CM/GC Services\u003c/li\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eRFQ Date: 12-29-25\u003c/strong\u003e\u003c/li\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eProject Name:\u003c/strong\u003e Science Research Building\u003c/li\u003e\r\n\u003c/ul\u003e\r\n

Consultant Points
Andersen Construction 85.4
CORE Construction 82.2
Hensel Phelps 78.8
Layton Construction 77.4
ESI Construction 71.4

“},”row-2”:{“field_900c95cf”:”Project Number DPW26-194″,”field_7d64e781″:”\u003cul\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eRFQ Advertiser: DPW\u003c/strong\u003e\u003c/li\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eRFQ Type:\u003c/strong\u003e Architect/Engineer Services\u003c/li\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eRFQ Date: 11-18-25\u003c/strong\u003e\u003c/li\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eProject Name:\u003c/strong\u003e Multi Building Switchgear Replacements\u003c/li\u003e\r\n\u003c/ul\u003e\r\n

Consultant Points
WSP USA Buildings 84.8
Cator Ruma 80.7
Musgrove Architects 79

“},”row-3”:{“field_900c95cf”:”Project Number DPW26-196″,”field_7d64e781″:”\u003cul\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eRFQ Advertiser: DPW\u003c/strong\u003e\u003c/li\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eRFQ Type:\u003c/strong\u003e Architect/Engineer Services\u003c/li\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eRFQ Date: 10-29-25\u003c/strong\u003e\u003c/li\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eProject Name:\u003c/strong\u003e Multi Bldg. HVAC R-22 Replacements\u003c/li\u003e\r\n\u003c/ul\u003e\r\n

Consultant Points
Cushing Terrell 87.10
CSHQA 80.70

“},”row-4”:{“field_900c95cf”:”Project Number DPW25-195″,”field_7d64e781″:”\u003cul\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eRFQ Advertiser: DPW\u003c/strong\u003e\u003c/li\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eRFQ Type:\u003c/strong\u003e Architect/Engineer Services\u003c/li\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eRFQ Date: 9-25-25\u003c/strong\u003e\u003c/li\u003e\r\n \t\u003cli\u003e\u003cstrong\u003eProject Name:\u003c/strong\u003e Albertsons Library Renovations\u003c/li\u003e\r\n\u003c/ul\u003e\r\n

Consultant Points
Hummel Architects 95.80
Lombard Conrad Architects 90.75
Hutchinson-Smith Architects 86.47

“}}}},”field_549bdc42″:”en”,”field_0733016e”:”h2″,”field_f8661ef5″:”remove_padding”,”field_22284b01″:”remove_padding”},”mode”:”edit”} /–>