Capital Renewal Phase 2 Projects

Project NumberProject FocusBuilding
BSU-4.03Fire Alarms100 High Bay HML
BSU-4.04Fire Alarms235 Ineractive Learning Center
BSU-4.05Fire Alarms039 Barnes Towers
BSU-6.05Switchgear004 Admin
BSU-6.06Switchgear013 Morrison Center
BSU-6.07Switchgear071 Education
BSU-6.08Switchgear007 Campus School
BSU-13HVAC072 Science
BSU-14DI Water072 Science
BSU-19Elevator015 Extra Mile Arena
BSU-20Booster Pump015 Extra Mile Arena
BSU-21HVAC ControlsMultiple
BSU-29Roof032 Student Union Building
BSU-30Roof036 Varsity Center
BSU-31Domestic Hot Water102 Rec Center
BSU-32HVACBOAS
BSU-34.01HVAC Controls072 Science
BSU-34.02HVAC Controls027 Library
BSU-34.03HVAC Controls030 Liberal Arts
BSU-34.04HVAC ControlsInfrustructure Campus Wide
BSU-34.05HVAC Controls074 Green House
BSU-34.06HVAC Controls024 Math Geo
BSU-34.07HVAC Controls007 Campus School
BSU-34.08HVAC Controls025 Bronco Gym
BSU-35HVAC071 Education
BSU-36Electrical LoopCampus Wide
BSU-37Elevator071 Education
BSU-38.01Galvanized Pipe030 Liberal Arts
BSU-38.02Galvanized Pipe034 RiverFront Hall
BSU-38.03Galvanized Pipe027 Library
BSU-38.04Galvanized Pipe011 Communications
BSU-39.01HVAC RTU’s100 High Bay HML
BSU-39.02HVAC RTU’s016 SMASH
BSU-39.03HVAC RTU’s347 BODO
BSU-39.04HVAC RTU’sCapital Village
BSU-40Elevator255 Linclon Garage
BSU-41Domestic Snitary Sewer Line032 Student Union Building
BSU-42Water Heater036 Varsity Center